Going solar in New York: utilities, permits and hookup

    Energy Company serves homes across New York State. Your utility decides how solar is credited on your bill and how your system gets connected, and your city, town or village issues the permits. Here is how it works in each utility territory.

    Con Edison: New York City and Westchester County

    Con Edison delivers electricity in New York City and Westchester County. The Rockaway Peninsula in Queens is part of LIPA's territory instead (see the Long Island section). From September 2025 to August 2026, the average residential price was 38.52 cents per kWh, based on federal EIA data. Under net metering, new home systems pay a monthly Customer Benefit Contribution, which was $1.84 per kW of panels at Con Edison in 2025.

    PSEG Long Island: Nassau and Suffolk counties and the Rockaways

    PSEG Long Island manages the grid for the Long Island Power Authority (LIPA), whose territory covers Nassau and Suffolk counties and the Rockaway Peninsula in Queens. The villages of Rockville Centre, Freeport and Greenport are not part of it. Under LIPA's interconnection rules, PSEG Long Island has 10 business days to review an application for a system of 50 kW or less, and 10 business days to make the metering changes for net metering.

    National Grid: Buffalo, Syracuse, Albany and much of upstate

    National Grid serves the urban areas of Buffalo, Syracuse and Albany, plus rural areas across much of upstate New York. From September 2025 to August 2026, the average residential price was 23.24 cents per kWh. Under net metering, unused credits carry over to the next bill and are cashed out at the avoided cost rate in your anniversary month, and the 2025 monthly charge for new systems was $1.49 per kW.

    NYSEG: Binghamton, Ithaca, Elmira and Lockport

    NYSEG serves more than 40% of upstate New York. Its electric tariff territory includes the cities of Binghamton, Ithaca, Elmira and Lockport. Under net metering, NYSEG's 2026 monthly charge for new home systems is $1.1917 per kW.

    RG&E: Rochester and the surrounding region

    Rochester Gas and Electric (RG&E) serves a nine-county region centered on the City of Rochester. From September 2025 to August 2026, the average residential price was 23.88 cents per kWh. Under net metering, the 2025 monthly charge for new home systems was $1.27 per kW.

    Central Hudson: Poughkeepsie and the Mid-Hudson Valley

    Central Hudson serves about 315,000 electric customers in eight counties, from the suburbs of New York City north toward the Albany area. Its July 2026 storm update names Columbia, Dutchess, Orange, Putnam, Sullivan and Ulster counties, along with the Town and City of Poughkeepsie and Hyde Park. Under net metering, the 2025 monthly charge for new home systems was $1.72 per kW.

    Orange & Rockland: Rockland, Orange and Sullivan counties

    Orange & Rockland (O&R) serves Orange, Rockland and Sullivan counties in New York, including Middletown, Nyack, Port Jervis and Suffern. Under net metering, excess credits carry forward month to month, and the 2025 monthly charge for new home systems was $1.46 per kW.

    Other utilities: city-owned utilities and co-ops

    New York also has 47 municipal electric utilities and 4 rural electric co-ops that own and run their own distribution systems. Municipal utilities and co-ops set their own solar rules. If your utility isn't named here, the Energy Plan still applies wherever we serve in New York.

    Solar permits in New York

    Your city, town or village issues the permits for a home solar system. Municipalities can adopt the New York State Unified Solar Permit, which sets a uniform process and a faster review for standard systems. Expect a building or alteration permit plus a separate electrical permit filed by a licensed electrician, as in these examples.

    In New York City, a solar job connected to your home's electrical or structural systems needs Department of Buildings work permits, filed by a registered design professional, with a final inspection at the end.

    In Rochester, the city uses the Unified Solar Permit application for solar projects.

    In Syracuse, projects that need a plan check average 2 to 4 weeks, and electrical work needs its own trade permit.

    In Albany, only a licensed electrician can apply for the electrical permit, and the city says the average review takes seven days.

    Utility interconnection in New York

    New York's investor-owned utilities follow the state's Standardized Interconnection Requirements. For systems of 50 kW or less, the utility has 10 business days to review a complete application. After installation, the utility has 10 business days to make metering changes, and it sends an acceptance letter within 5 business days of being told testing passed. Regular operation begins after verification testing passes. On Long Island, PSEG Long Island follows LIPA's own rules, which set similar 10 business day steps.

    Solar lease or PPA: what the Energy Plan handles

    With an Energy Plan, one company designs, finances, installs, monitors and maintains your system, and you make one monthly payment. That includes the permit filings and the utility application described above. With a lease, you make a fixed monthly lease payment, with any yearly increase set in your agreement up front. With a power purchase agreement, your payment can change, as your agreement explains. Plans start at $0 down. For tax credits, net metering and battery programs, see our New York incentives page.

    Frequently asked questions

    Do you serve my area of New York?
    Yes. We serve homes across New York State. Your utility decides how solar is credited and connected, and this page covers each one.
    Which utility serves upstate New York?
    National Grid serves Buffalo, Syracuse, Albany and much of upstate New York. NYSEG serves more than 40% of upstate New York, and RG&E serves the Rochester region.
    Who handles solar hookup on Long Island?
    PSEG Long Island, which manages LIPA's grid in Nassau and Suffolk counties and the Rockaway Peninsula. LIPA's rules give it 10 business days to review an application for a system of 50 kW or less.
    Is there a standard solar permit in New York?
    Municipalities can adopt the New York State Unified Solar Permit, which sets a uniform process with a faster review for standard systems. Rochester, for example, uses it.
    Do I need a permit for solar panels in NYC?
    Yes. In the five boroughs, a solar job connected to your home's electrical or structural systems needs Department of Buildings work permits.
    How long does utility interconnection take in New York?
    For systems of 50 kW or less, state rules give the utility 10 business days to review a complete application. PSEG Long Island has the same 10 business days under LIPA's rules.
    How does a solar lease or PPA work in New York?
    NYSERDA's homeowner guide says that with a lease, a developer installs and owns the system on your home, and with a PPA, a financing company buys, installs and maintains it. NYSERDA incentives for leases or PPAs must be reflected in the agreement.