Going solar in Georgia: your utility, permits and Energy Plan
Solar across Georgia
Energy Company serves homes across all of Georgia. Your utility decides how your solar is credited and how it gets hooked up, so check the name on your bill. Georgia Power is the large investor-owned utility and serves customers in all but four of Georgia's 159 counties. The state also has 41 electric membership corporations (EMCs) and 52 city-owned electric systems.
Georgia Power: Atlanta and most of Georgia
Georgia Power serves 2.8 million customers. Its regions map names Atlanta, Macon, Savannah, Augusta, Columbus, Albany, Valdosta and Athens.
Based on U.S. Energy Information Administration data for 2024, the average residential price at Georgia Power was 15.49 cents per kWh. Georgia Power credits solar you send to the grid at its annual solar avoided cost rate, which is 3.2188 cents per kWh for 2026. A home system on its solar tariff can be up to 10 kW AC. See Georgia solar incentives 2026: net metering and tax rules for detail.
You or your installer apply through Georgia Power's online PowerClerk tool, and the customer signs the application. Georgia Power reviews it, you sign a service and interconnection agreement, and the system is installed and inspected by your local building office. Georgia Power may then witness test the system, programs the meter and grants permission to operate. The interconnection fee for a home system is $100.
Other utilities: city-owned utilities and co-ops
EMCs and city-owned utilities set their own solar rules. Here are the larger ones we've checked. If your utility isn't named here, tell us your address and we'll confirm what's available for your home.
Cobb EMC buys excess solar under its Distributed Generation schedule, at $0.05121 per kWh for systems connected on or after July 1, 2015. You must finish its interconnect agreement at least 45 days before you plan to connect, the city or county inspects the system, and Cobb EMC then swaps in a net meter and bills a $100 interconnection fee. Its average residential price was 11.41 cents per kWh in 2024.
Sawnee EMC's net metering rider covers systems a member owns or leases. It buys excess solar at $0.0548 per kWh, and a home system is generally limited to 10 kW AC. Sawnee approves your plans before installation, the approval is valid for 90 days, and Sawnee issues permission to operate after the building official's inspection passes and it reprograms the meter. Its average residential price was 11.54 cents per kWh in 2024.
Walton EMC credits energy you send to the grid at $0.026 per kWh for 2026, and its metering cost is currently $800. Its average residential price was 12.99 cents per kWh in 2024.
Solar permits in Georgia
Your city or county issues the solar permit. Georgia's mandatory state codes, including the International Residential Code and the National Electrical Code, apply to all construction, whether or not a local government enforces them. Georgia Power requires your local building office to inspect the system before it connects.
In Atlanta, roof-mounted home systems up to 25 kW can go through the Office of Buildings' express process. You need two plan sets, a notarized arborist affidavit, an electrical one-line diagram and equipment specifications, and the electrical permit fee starts at $175 based on project value. A final electrical inspection follows.
In Savannah, you apply for a solar permit through the city's eTRAC portal, for rooftop or ground-mounted work.
Steps and utility approval times
The order is the same across the state: site review, design, permit, installation, inspection, then the utility's approval and meter.
State law requires notice to your utility at least 30 days before a system financed through a solar financing agent starts operating. Georgia Power doesn't publish review times, and it says extra time may be needed if it has to build interconnection facilities or upgrades. Cobb EMC asks for the interconnect agreement at least 45 days before you connect, and Sawnee EMC's approval is valid for 90 days.
Solar lease or PPA: what your Energy Plan covers
An Energy Plan is a solar lease or power purchase agreement. Georgia's Solar Power Free-Market Financing Act covers an agreement, lease or other arrangement with a solar financing agent, with payments based on the system's performance and output, for home systems up to 10 kW AC. Your utility can't block or interfere with it, and the law reaches every electric supplier, including EMCs and city-owned systems. With an Energy Plan, one company handles the design, financing, installation, monitoring and upkeep of your solar and battery, and you pay one monthly bill for all of it. With a lease, you make a fixed monthly lease payment, with any yearly increase set in your agreement up front. With a power purchase agreement, your payment can change, as your agreement explains. Plans start at $0 down.
For buyback rates, rate changes and programs, see Georgia solar incentives 2026: net metering and tax rules.
Looking for solar incentive details? See Georgia incentives.
Frequently asked questions
Do you serve my area of Georgia?
Which utility serves my home?
Can I lease solar panels in Georgia?
Can my EMC or city utility block a solar lease or PPA?
How big can a home solar system be in Georgia?
How long does Georgia Power take to connect solar?
Do I need a permit for solar panels in Georgia?
Ready to go solar?
Get a custom solar design tailored to your specific location in Georgia.