Going solar in Vermont: your utility, permits and solar lease
Solar across Vermont
Energy Company serves homes across all of Vermont. Your utility decides how your solar is credited and how it gets hooked up, so check the name on your bill. The larger utilities are Green Mountain Power (GMP), Vermont Electric Cooperative (VEC) and Burlington Electric Department (BED). Every home system also needs a certificate of public good from the state Public Utility Commission.
Green Mountain Power: about 277,000 Vermont customers
GMP serves about 277,000 residential and business customers in Vermont, with offices in Colchester and Rutland.
GMP's residential energy rate is 22.639 cents per kWh on bills from October 1, 2026, before monthly customer charges. Under net metering, extra power your system makes is credited at 20.71 cents per kWh, adjusted by a siting adjustor and a renewable energy credit (REC) adjustor, and credits expire after 12 months. See Vermont solar incentives and net metering rules for the adjustors. GMP's hookup steps are under Steps below.
Other utilities: city-owned utilities and co-ops
VEC is a member-owned co-op serving over 33,000 members in 75 communities. It credits extra power at the statewide blended residential rate of 20.71 cents per kWh, adjusted for siting and RECs, and unused credits expire 12 months after they are earned.
BED serves Burlington. To get all net metering benefits, your system must be connected to the grid and have a separate generation meter, which only BED provides and installs. Excess power is credited on your bill.
If your utility isn't named here, tell us your address and we'll confirm what's available for your home.
Solar permits in Vermont
Every grid-connected home system needs a certificate of public good from the Public Utility Commission. Systems of 15 kW or less use a short registration, and the registration form also serves as the interconnection application. Under the state rule, you may start building on the 15th day after filing the form, unless the Commission says otherwise.
Some cities and towns also require local permits, which include an inspection after installation and before the system connects to the grid.
In Burlington, all permits go through the city's Department of Public Works, and you schedule an inspection with its electrical inspector after installation. BED won't energize a system without an approved inspection.
Steps and utility approval times
The order is the same across the state: site review, design, state registration and any local permit, installation, inspection, then the utility's approval and meter.
At VEC, systems up to 15 kW register through the Commission's ePUC system, and VEC emails any issues by the 15th day after a complete application. Your installer then asks VEC for the production meter. At BED, systems of 15 kW or less need no separate interconnection application, but you file a service application with BED before installation. At GMP, you need the certificate of public good and a meter that measures what your system makes. GMP charges a one-time fee of $37 per kW for systems of 15 kW or less, on the first bill after interconnection.
How a solar lease works with an Energy Plan
In Vermont, an Energy Plan is a lease. The Vermont Department of Public Service's solar guide describes a lease as an arrangement where somebody else owns the solar panels at your home, and lists it among the ways to pay over time. A single company designs, finances, installs, monitors and maintains your solar and battery, and you make a fixed monthly lease payment, with any yearly increase set in your agreement up front. Energy Plans have $0 down.
For net metering credits, adjustors and tax rules, see Vermont solar incentives and net metering rules.
Looking for solar incentive details? See Vermont incentives.
Frequently asked questions
Do you serve my area of Vermont?
Which utility serves my home?
Can I lease solar panels in Vermont?
Do I need a permit for solar panels in Vermont?
How long does state approval take for a small system?
Do Vermont net metering credits expire?
Does Burlington require an inspection?