    Solar across Nevada

    Energy Company serves homes across all of Nevada. Your utility decides how your solar is credited and how it gets hooked up, so check the name on your bill. Most Nevada homes are served by one of two utilities that both do business as NV Energy: Nevada Power Company and Sierra Pacific Power Company. NV Energy says it provides electricity to 2.4 million customers across a service area of more than 44,000 square miles.

    Nevada Power (NV Energy): Las Vegas area and southern Nevada

    Nevada Power serves Southern Nevada. NV Energy names Las Vegas and Henderson among the communities it serves.

    Based on U.S. Energy Information Administration data for 2024, the average residential price at Nevada Power was 15.33 cents per kWh. Under NV Energy's net metering rider for homes, energy you send to the grid beyond what you use in a billing period earns a credit, and the credit rolls over to your next bill. For new customers, that credit is set at 75% of the retail rate and is kept for 20 years at the same location. See Nevada solar incentives, net metering and tax rules for current rates.

    Sierra Pacific Power (NV Energy): Reno area and northern Nevada

    Sierra Pacific Power serves Northern Nevada. NV Energy names Reno-Sparks and Elko among the communities it serves.

    Based on U.S. Energy Information Administration data for 2024, the average residential price at Sierra Pacific Power was 14.52 cents per kWh. Sierra Pacific closed its earlier net metering rider to new customers on October 1, 2025. Its new rider, NMR-2025, follows the same structure but nets your use and your solar output in 15-minute intervals. See Nevada solar incentives, net metering and tax rules for detail.

    Other utilities: city-owned utilities and co-ops

    NV Energy's map of Nevada's electric utilities shows 11 other utilities, including electric co-ops, power districts and city-owned utilities. The Public Utilities Commission of Nevada regulates their service territories, but not their rates or service quality. These utilities set their own solar rules. If your utility isn't named here, tell us your address and we'll confirm what's available for your home.

    Solar permits in Nevada

    Your city or county issues the solar permit. State law (NRS 278.0208) says a city or county can't adopt a rule or take an action that prohibits or unreasonably restricts a property owner's use of a solar energy system. Deed covenants and restrictions that do the same are void. A restriction counts as unreasonable if it cuts the system's efficiency or performance by more than 10%, as determined by the Director of the Office of Energy, unless a comparable alternative is available.

    In Las Vegas, a licensed electrical contractor can get a residential solar permit the same day through the city's online portal for systems without a battery or ballast. Systems with a battery need a full plan review. Only one solar inspection is required.

    In Reno, the city says it is a SolSmart Silver community and earned points for streamlining its solar permitting.

    Steps and utility approval times

    The order is the same across the state: site review, design, permit, installation, inspection, then the utility's approval and meter.

    At NV Energy, the application goes in online first, with a fee of $189 in Southern Nevada or $184 in Northern Nevada. NV Energy reviews it within 10 business days, and that review approves your system size before installation. After the local permit, installation and final inspection, you send the permit, the final inspection card and the signed interconnection agreement. NV Energy reviews those within 10 business days and moves the project to its inspection queue. A technician then inspects the system and sets any meters, and NV Energy emails permission to operate. The system can't be turned on before that, and credits start only after the meter is set.

    Solar lease or PPA: what your Energy Plan covers

    An Energy Plan is a solar lease or power purchase agreement. With an Energy Plan, one company handles the design, financing, installation, monitoring and upkeep of your solar and battery, and you pay one monthly bill for all of it. With a lease, you make a fixed monthly lease payment, with any yearly increase set in your agreement up front. With a power purchase agreement, your payment can change, as your agreement explains. Under state law, a company that sells you power from a system on your home must keep that system to no more than 150% of your home's yearly electricity needs. To net meter with NV Energy, a system can be sized to no more than 100% of your yearly use. Nevada law also gives you at least 3 business days to cancel a lease or power purchase agreement after you sign it. Plans start at $0 down.

    For net metering rates, programs and tax rules, see Nevada solar incentives, net metering and tax rules.

    Frequently asked questions

    Do you serve my area of Nevada?
    Yes. We serve homes across Nevada. Your utility, whether Nevada Power, Sierra Pacific Power or a co-op or city-owned utility, decides how your solar is credited and connected.
    Which utility serves my home?
    Check the name on your bill. Nevada Power serves Southern Nevada and Sierra Pacific Power serves Northern Nevada. Both do business as NV Energy, which names Las Vegas, Henderson, Reno-Sparks and Elko among the communities it serves.
    Can I lease solar panels in Nevada?
    Yes. Nevada law sets disclosure rules for solar leases and power purchase agreements, including a right to cancel within at least 3 business days of signing. In Nevada, an Energy Plan can be a lease or a power purchase agreement.
    Is there a size limit for a solar PPA in Nevada?
    Yes. A system that sells power to the home it sits on can produce no more than 150% of that home's yearly electricity needs. NV Energy's net metering also limits a system to 100% of your yearly use.
    How long does NV Energy take to approve solar?
    NV Energy reviews a complete application within 10 business days, and reviews your final documents within 10 business days before its inspection and meter set.
    Do I need a separate review for a solar battery in Las Vegas?
    Yes. Las Vegas issues same-day permits only for systems without a battery. A system with a battery needs a full plan review.
    Can my HOA ban solar panels in Nevada?
    No. State law voids deed covenants and restrictions that prohibit or unreasonably restrict a solar energy system.