Going solar in Virginia: your utility, permits and Energy Plan

    Solar across Virginia

    Energy Company serves homes across all of Virginia. Your utility decides how your solar is credited and how it gets hooked up, so check the name on your bill. The investor-owned utilities are Dominion Energy Virginia, Appalachian Power and Kentucky Utilities, which serves Virginia customers as Old Dominion Power. Electric co-ops and city-owned utilities serve other homes, and co-ops follow their own net metering law.

    Dominion Energy Virginia: based in Richmond

    Dominion Energy is headquartered in Richmond and provides electricity to more than 2.5 million homes and businesses in Virginia.

    Dominion's net metering credits excess energy against future use, valued at what you'd pay for your next kWh. A system can't reasonably produce more than 150% of your expected yearly use, and state law caps a home system at 25 kW. At the end of each 12-month net metering period, you can sell leftover excess to Dominion under a power purchase agreement priced at the regional wholesale market average for the most recent year. A home system over 20 kW AC pays a monthly standby charge. See Virginia solar incentives 2026: net metering and tax rules for detail.

    You or your installer submit Dominion's Net Metering Interconnection Notification form. Dominion grants contingent approval once you and your installer sign, installs a two-way meter, and issues permission to operate after a licensed Virginia electrician certifies the system or the local inspection passes and metering and billing are set up. Dominion says interconnection charges are often zero for small home systems.

    Appalachian Power

    Appalachian Power serves about 1.1 million customers in Tennessee, Virginia and West Virginia. In Virginia, its Net Energy Metering Service tariff gives bill credits for excess generation, not checks, and leftover credit carries to the next month's bill. See Virginia solar incentives 2026: net metering and tax rules for detail.

    You apply through Appalachian Power's online portal before installing. It says a fully completed application that meets its requirements is approved within 35 days, and 90 to 95% are approved in the first review. After you install and pass local permits and inspections, it verifies the system in the field, installs a two-way meter and tells you to switch it on, and you sign the interconnection service agreement.

    Other utilities: city-owned utilities and co-ops

    Virginia's electric co-ops follow a separate net metering law. A co-op home system can be up to 20 kW and can't be sized above your expected yearly use, and residential net metering is open until it reaches 2% of the co-op's system peak, which the co-op board can raise. Homes with systems over 10 kW pay a monthly standby charge. Co-op law lets you arrange for others to own or operate the system.

    Rappahannock Electric Cooperative serves over 185,000 connections in portions of 22 Virginia counties, with offices in Fredericksburg, Culpeper, Bowling Green and Front Royal. Its net metering page describes leases, where the contractor owns and operates the system and you make a fixed monthly payment. A home system can be up to 20 kW AC and can't be projected to produce more than 100% of your past 12 months of use. Excess kWh carry forward as a credit. You apply through PowerClerk, REC has 30 days to approve or return the application, and you install only after approval. After a licensed Virginia electrician certifies the system or the local inspection is done, REC inspects it, installs the net meter and issues permission to operate. The inspection fee is $50 for systems over 10 kW AC.

    City-owned utilities set their own solar rules. If your utility isn't named here, tell us your address and we'll confirm what's available for your home.

    Solar permits in Virginia

    Your city or county issues the solar permit. In 2026 the General Assembly passed a Smart Rooftop Permitting bill (HB 590 / SB 382) that creates an automated online solar permitting tool at the Virginia Department of Energy, which localities can adopt or replace with their own system.

    Steps and utility approval times

    The order is the same across the state: site review, design, permit, installation, inspection, then the utility's approval and meter.

    Appalachian Power says it approves a fully completed application within 35 days, and Rappahannock Electric Cooperative has 30 days to approve or return one. Dominion doesn't publish review times.

    If your Energy Plan is a power purchase agreement, written notice must reach the State Corporation Commission and your utility at least 30 days before the agreement takes effect.

    Solar lease or PPA: what your Energy Plan covers

    An Energy Plan is a solar lease or power purchase agreement, and in co-op territory it is a lease unless your co-op's board has allowed third-party power purchase agreements for homes. State law says a lease or other arrangement where a third party owns, maintains or operates the system on your property is not a sale of electricity. In the territories of Dominion, Appalachian Power and Old Dominion Power, a state pilot program allows third-party power purchase agreements for homes, up to a statewide limit, with the 25 kW home size limit. In co-op territory, these agreements are limited to certain tax-exempt customers unless the co-op board permits them. With an Energy Plan, one company handles the design, financing, installation, monitoring and upkeep of your solar and battery, and you pay one monthly bill for all of it. With a lease, you make a fixed monthly lease payment, with any yearly increase set in your agreement up front. With a power purchase agreement, your payment can change, as your agreement explains. Plans start at $0 down.

    For net metering rules, standby charges and programs, see Virginia solar incentives 2026: net metering and tax rules.

    Frequently asked questions

    Do you serve my area of Virginia?
    Yes. We serve homes across Virginia. Your utility, whether Dominion Energy, Appalachian Power, Old Dominion Power, a co-op or a city-owned utility, decides how your solar is credited and connected.
    Can I lease solar panels in Virginia?
    Yes. State law says a lease of a system on your property isn't a sale of electricity, and co-op law lets you arrange for others to own or operate it.
    Can I get a solar PPA in Virginia?
    In Dominion, Appalachian Power and Old Dominion Power territory, yes, under the state's third-party power purchase agreement pilot, which has a statewide capacity limit. In co-op territory, only if your co-op's board allows it.
    How big can a home solar system be in Virginia?
    Up to 25 kW at the investor-owned utilities, and up to 20 kW at a co-op.
    Do I need a permit for solar panels in Virginia?
    Yes. Your city or county issues it. A 2026 bill creates a state online permitting tool that localities can adopt.
    How long does Appalachian Power take to approve solar?
    It says a fully completed application that meets its requirements is approved within 35 days.
    Is there a waiting period before a solar PPA starts?
    Yes. Notice must reach the State Corporation Commission and your utility at least 30 days before the agreement takes effect.