Florida solar incentives and net metering rules
Florida's solar rules come from three places: a statewide net metering rule for investor-owned utilities, two state tax exemptions, and the separate policies of city-owned utilities. Here is what each one says, with the source.
Net metering at FPL, Duke Energy Florida, Tampa Electric and FPUC
Florida Administrative Code rule 25-6.065 sets net metering for investor-owned utilities. When your system makes more than your home uses in a billing cycle, the extra is credited to your next month's energy use. Credits can roll forward for up to twelve months. At the end of that period, unused credit is paid out at an average annual rate based on the utility's COG-1 as-available energy tariff, and the same payout applies if you close your account.
You still pay the utility's customer charge and any demand charge every month, and power you use beyond your own production is billed on your normal rate schedule.
OUC moved to TruNet for new applications
Orlando Utilities Commission is city-owned and sets its own terms:
- Systems connected or approved on or before June 30, 2025 keep the full retail rate through June 30, 2045.
- Completed applications on or after July 1, 2025 got the full retail rate during a grace period that OUC dates to fall 2026, then move to the Community Solar Energy Rate until June 30, 2030, and then to the Retail Levelized Fuel Rate.
- A home sold or transferred after June 30, 2025 moves to the post-July 2025 schedule.
- From November 1, 2026, OUC retires the solar bank: excess energy is credited in the month it is made, and leftover money credit carries forward.
- OUC lists an optional battery rebate for customers who waive the full retail rate on exports. Its page does not state the amount.
JEA, also a municipal utility, is likewise outside rule 25-6.065, which is written for investor-owned utilities. Ask JEA for its current terms before you sign anything.
Solar fees and interconnection rules
Under rule 25-6.065, a Tier 1 system is 10 kW or less, Tier 2 is over 10 kW up to 100 kW, and Tier 3 runs to 2 MW. A system cannot exceed 90% of your utility distribution service rating. For Tier 1, the utility cannot charge fees beyond those other retail customers pay and cannot require liability insurance. Tier 2 insurance requirements are capped at $1 million.
The rule also sets the utility's clock. It must confirm receipt or flag missing items within 10 business days, sign the interconnection agreement within 30 calendar days of a complete application, and finish any physical inspection within 30 calendar days of your signed agreement. You give at least 10 days' notice before placing the system in service.
FPL adds that estimated yearly production must be under 115% of your yearly use. OUC charges no fee for 0 to 10 kW, $340 for Tier 2 and $1,300 for Tier 3.
Florida solar tax exemptions
- Property tax: for residential property, Florida excludes the entire just value of a renewable energy source device from assessed value. The current wording of that exclusion expires December 31, 2037.
- Sales tax: solar energy systems and their components, including storage units, are exempt from Florida sales and use tax.
- Federal 25D credit: the IRS says it is not allowed when installation is completed after December 31, 2025.
How this fits an Energy Plan
With an Energy Plan, a single company designs, finances, installs, monitors and maintains your system, and you make one monthly payment. Installation steps and city permit details are on our Going solar in Florida page.
Looking for solar coverage in Florida? See solar service in Florida.
Frequently asked questions
How much does FPL pay for extra solar power?
Are batteries exempt from sales tax?
I'm on OUC. Is my rate changing?
Does Florida still have net metering?
Do solar panels raise property taxes in Florida?
Does FPL have a minimum bill?
Ready to go solar?
Get a custom solar design tailored to your specific location in Florida.
