Washington solar incentives and net metering rules

    Washington net metering law and its 2029 deadline

    Every Washington electric utility must offer net metering, first come, first served, until June 30, 2029 or until net metering reaches 4% of its 1996 peak demand, whichever comes first. After that, a customer who started net metering before the cutoff keeps getting credit under the law while the interconnection agreement stays valid.

    Utilities can then move new customers to a successor rate. Investor-owned utilities file theirs with the Utilities and Transportation Commission, which has one year to approve, reject or approve it with conditions. Consumer-owned utilities set their own.

    As of January 2026, the WSU Energy Program reports that PSE had reached 132% of its 4% threshold, Pacific Power 115%, Avista 78% and Snohomish County PUD 78%. The state Department of Commerce says most utilities that reached the threshold still offer retail-rate net metering.

    PSE net metering (Schedule 150)

    PSE net metering covers systems up to 100 kW on its standard rate schedules, but not its time-of-use schedules 307 and 327. Extra power is banked as kWh credits that offset future energy charges. Banked credits expire March 31 each year and can't be cashed out or moved to another customer.

    PSE's Schedule 150 is open to customers who apply until December 31, 2025, or until a replacement net metering schedule is in place, whichever is later. PSE has not listed a replacement schedule among its pending filings.

    Avista net metering

    Avista offers net metering for systems of 100 kW or less. Surplus power earns kWh credits, not cash, and the credit bank resets each year on March 31. Avista says customers approved under its current schedule can stay until regulators require changes.

    Pacific Power net metering and the move to net billing

    Pacific Power's Washington net metering covers systems up to 100 kW. Surplus power becomes a kWh credit on your next bill, and credits left after the March billing period each year go to the utility, not to you.

    Pacific Power filed to create Schedule 138, Net Billing Service, as the successor to net metering and to close Schedule 135 to new applications. The filing is pending, with an effective date of February 1, 2027. Pacific Power says complete applications submitted by February 1, 2027 can stay on net metering for 25 years, and later applicants would get an export credit rate tied to the utility's avoided cost instead of the full retail rate.

    Snohomish County PUD

    Snohomish County PUD uses net metering for systems under 100 kW and charges an $85 interconnection processing fee.

    Washington solar sales tax exemption

    Washington exempts state and local sales tax on the machinery and equipment for a solar system of 100 kW AC or less, and on qualifying installation labor. It covers equipment from July 1, 2019 through December 31, 2029, and installations that begin on or after July 1, 2019 and are complete by December 31, 2029. The exemption is claimed with an exemption certificate given to the seller at the time of sale. The Department of Revenue's notice doesn't address leased systems.

    Washington solar programs and their status

    Washington's state production incentive program is closed to new applications from PSE customers.

    The state is studying how to value rooftop solar after net metering. The Washington State Academy of Sciences' final report was due October 1, 2026, and will make recommendations on future rates for customer solar.

    Rate cases to watch

    PSE filed a three-year electric rate plan with the Utilities and Transportation Commission on February 27, 2026. News reports say the proposal would add about $28 a month to a typical home bill in 2027 and about $51 a month by 2029 if approved.

    The federal residential clean energy credit (25D) is not allowed for expenditures after December 31, 2025, and an expenditure counts as made when installation is complete.

    With an Energy Plan, you have one company for design, financing, installation, monitoring and maintenance, and one monthly payment. For hookup steps and permits, see Going solar in Washington.

    Frequently asked questions

    When does net metering end in Washington?
    Utilities must offer it until June 30, 2029, or until net metering reaches 4% of their 1996 peak demand, whichever comes first.
    What happens to my net metering if my utility changes its solar rate?
    If you started net metering before the cutoff, the law keeps your credit while your interconnection agreement stays valid.
    Is Pacific Power ending net metering in Washington?
    Pacific Power has proposed net billing for new applicants from February 1, 2027, and the filing is pending. It says complete applications by that date can stay on net metering for 25 years.
    Do PSE solar credits expire?
    Yes. Banked credits expire March 31 each year and can't be cashed out.
    Is PSE still taking net metering applications?
    Yes. Schedule 150 stays open until December 31, 2025 or until a replacement schedule is in place, whichever is later.
    Is there a sales tax exemption for solar in Washington?
    Yes. Sales tax is exempt on equipment and qualifying installation for solar systems of 100 kW AC or less, for installations complete by December 31, 2029.
    Is the Washington solar production incentive still open?
    No. It is closed to new applications from PSE customers.